Skip to main content
Building pollutant surveys

Asbestos, PCB and lead surveys before building works

Before a renovation, conversion or demolition, Batiscan locates asbestos, PCBs, PAHs, lead and HBCD, in a single building or across a portfolio of several properties, and gives you a report backed by ISO 17025 analyses to cost and plan the works.

Main area: canton of Vaud — Geneva, Fribourg, Valais, Neuchâtel and Jura on request

Initial scoping response within 24 working hours

Property managers and portfolios: our approach (FR)

Qualifications

  • SUVA
    SUVA-compliant
  • FACH
    FACH-recognised
  • ASCA
    ASCA methodology
  • ISO
    ISO 17025 analyses
  • CFST
    Directive 6503
  • CH
    Western Switzerland

They have trusted Batiscan

  • Canton de Vaud
  • Ville de Lausanne
  • Ville de Morges
  • EPFL
  • UNIL
  • CHUV
  • SBB CFF FFS
  • La Poste Suisse
  • État du Valais
Deliverables

What you receive

Every assignment produces documents that can be used directly by the project manager, the contractor, the authority and the owner.

Survey report

A structured document identifying the materials, their location, the analysis results and the risk classification.

Materials map

Annotated plans showing positive, suspect and clear areas, floor by floor and room by room.

Laboratory results

Analysis reports from the ISO 17025 accredited laboratory, with sample references and the methods used.

Recommendations for the works

Measures to take before, during and after the works, depending on the pollutant and the risk identified.

Photographic record

Photos of every sampling point and of the materials inspected, included in the report for traceability.

End-of-remediation record

If Batiscan follows the remediation: visual checks, measurements and end-of-works documentation, as required.

Method

How a survey works

Every survey follows the same four steps, from first contact to report.

  1. 1

    Initial scope

    You describe the building and the planned works. Within 24 working hours you receive an initial scope: the right survey, any missing information and the recommended next steps.

  2. 2

    Site visit and sampling

    On-site survey of suspect materials. Samples are taken discreetly and the sampling points are neatly filled in.

  3. 3

    Laboratory analyses

    Samples are analysed by an ISO 17025 accredited laboratory.

  4. 4

    Report

    Delivered within 10 working days of the site visit, analyses included, in line with EKAS/CFST directive 6503 and the ASCA methodology: mapping of materials, results and recommendations.

Two exceptions: for a portfolio of several buildings, a scoping phase of usually 2 to 3 weeks comes before the site visits; in urgent cases, laboratory analyses can be obtained within 24 to 48 hours.

Open a case

Present your project

Describe your project: address, construction year, planned works and timeline. We come back with the right survey scope and recommended next steps.